Alle Auftraggeber

Öffentlicher Auftraggeber · Österreich

RailNetEurope

1aktive Verfahren
14beobachtete Verfahren
6,4 Mio. €publiziertes Volumen
2offizielle Quellen

Beschaffungshistorie

Jüngste beobachtete Verfahren

OffenFrist morgen

TRANSLATE4RAIL LANGUAGE TOOL FURTHER DEVELOPMENT (T4R LT NEXT)

IT-DienstleistungenWien
RailNetEurope Frist 25. Sep. 2026 Publiziert 04. Sep. 2026

Award of a Framework Agreement for the procurement of Services, development and upgrade of the T4R LT prototype to the next Level

Österreichische Kerndaten Details
Frist beendet

Digital Railway Infrastructure Information System (DRIIS)

IT-Dienstleistungen
RailNetEurope Frist 15. Feb. 2022 Publiziert 19. Jän. 2022

Digital Railway Infrastructure Information System (DRIIS) - Software develpment and maintenance

TED – EU-Amtsblatt · 3 Quellenansichten Details
Frist beendet

Development of Rail Capacity Broker (RCB) and migration of data from legacy application PCS

IT-Dienstleistungen
RailNetEurope Frist 15. März 2022 Publiziert 04. März 2022

The contract consists of the design, development, maintenance and operation of the so-call PCS - Capacity Broker system. PCS – CB is in essence the new major version of the existing PCS-Envelope Concept (PCS-EC). The new major version can be split, by processes which would be supported, into eight main parts: 1. New Path Request (Annual Timetable) 2. Late Path Request 3. Ad-Hoc Path Request 4. Short-term ad hoc request (as a subtype of Ad-Hoc Path Request) 5. Rolling Planning Path Request 6. Feasibility Studies process 7. Path Modification 8. Path Alteration

TED – EU-Amtsblatt · 2 Quellenansichten Details
Frist beendet

Development of TCR Tool and ECMT and migration their data from legacy applications

IT-Dienstleistungen
RailNetEurope Frist 19. Jän. 2023 Publiziert 12. Dez. 2022

To develop the new application (TCR Tool and ECMT – Fusion) which would have multiple modules: • TCR Tool (a subset of the current TCR Tool) • Capacity Model (a subset of the current ECMT) • Capacity Supply (a subset of the current ECMT) Target solution is one application which is fully TAF/TAP TSI compliant, with a modular structure which holds all functionalities currently supported by TCR Tool and ECMT plus the planned ones (for 2023 and 2024) built on top of one database.

TED – EU-Amtsblatt Details
Frist beendet€ 800.000

European Transport Market Study 2025

Technische StudienArchitektur und IngenieurwesenWien
RailNetEurope Frist 13. Feb. 2025 Publiziert 20. Jän. 2025

European Transport Market Study based on the Extended Feasibility Study and Implementation Plan with a defined scope and use case

TED – EU-Amtsblatt Details
Frist beendet

TRANSLATE4RAIL LANGUAGE TOOL FURTHER DEVELOPMENT (T4R LT NEXT)

IT-DienstleistungenWien
RailNetEurope Frist 31. Aug. 2026 Publiziert 10. Aug. 2026

Award of a Framework Agreement for the procurement of Services, development and upgrade of the T4R LT prototype to the next level

Österreichische Kerndaten Details
Frist beendet€ 762.396

European Transport Market Study 2025

Architektur und Ingenieurwesen
RailNetEurope Frist Publiziert 08. Juni 2025

European Transport Market Study based on the Extended Feasibility Study and Implementation Plan with a defined scope and use case

Österreichische Kerndaten Details
Frist beendet€ 1,4 Mio.

TCR Tool and ECMT – Fusion 2024

IT-Dienste: Beratung, Software-Entwicklung, Internet und HilfestellungIT-DienstleistungenWien
RailNetEurope Frist Publiziert 21. Mai 2024

Development of TCR Tool and ECMT and migration their data from legacy applications With the Timetable and Capacity Redesign – or ‘TTR for Smart Capacity Management’ – a market-oriented, efficient, digitalised and competitive capacity management process will be introduced to serve both passenger and freight market needs. The program aims to provide the market with more flexibility and promote better cooperation between all involved stakeholders across two phases: Advance Capacity Planning and Timetabling. To achieve these improvements and ensure smooth communication in this complex environment, the timetabling process must be supported by European and national IT systems. The TTR programme is strongly supported by the proposal of the European Commission on the usage of railway infrastructure capacity in the single European railway area. With the change of business processes on the European level, RNE will provide a completely new platform called Digital Capacity Management (DCM) that enables and supports the programme via software products. consists of three main products: • the Temporary Capacity Restrictions Tool (TCR Tool) • the European Capacity Management Tool (ECMT) • the Path

TED – EU-Amtsblatt · 2 Quellenansichten Details
Frist beendet€ 2,8 Mio.

TCR Tool and ECMT – Fusion 2024

IT-DienstleistungenWien
RailNetEurope Frist Publiziert 19. Mai 2024

Development of TCR Tool and ECMT and migration their data from legacy applications With the Timetable and Capacity Redesign – or ‘TTR for Smart Capacity Management’ – a market-oriented, efficient, digitalised and competitive capacity management process will be introduced to serve both passenger and freight market needs. The program aims to provide the market with more flexibility and promote better cooperation between all involved stakeholders across two phases: Advance Capacity Planning and Timetabling. To achieve these improvements and ensure smooth communication in this complex environment, the timetabling process must be supported by European and national IT systems. The TTR programme is strongly supported by the proposal of the European Commission on the usage of railway infrastructure capacity in the single European railway area. With the change of business processes on the European level, RNE will provide a completely new platform called Digital Capacity Management (DCM) that enables and supports the programme via software products. consists of three main products: • the Temporary Capacity Restrictions Tool (TCR Tool) • the European Capacity Management Tool (ECMT) • the Path

Österreichische Kerndaten · 2 Quellenansichten Details
Frist beendet€ 360.000

TIS NETA 2024

IT-Dienste: Beratung, Software-Entwicklung, Internet und HilfestellungIT-DienstleistungenWien
RailNetEurope Frist Publiziert 13. Feb. 2024

The intention is to ensure a train running forecast information in the RNE TIS by implementing a forecasting module to the application providing predictions for any train run having an available timetable and afterwards train running information. The RNE intends to find a developer via public procurement in the first half of 2024. The forecasting module for the RNE TIS should be developed and implemented in the first six months of the three-year contracted period.

TED – EU-Amtsblatt · 2 Quellenansichten Details
Frist beendet€ 303.000

TIS NETA 2024

IT-DienstleistungenWien
RailNetEurope Frist Publiziert 13. Feb. 2024

The intention is to ensure a train running forecast information in the RNE TIS by implementing a forecasting module to the application providing predictions for any train run having an available timetable and afterwards train running information. The RNE intends to find a developer via public procurement in the first half of 2024. The forecasting module for the RNE TIS should be developed and implemented in the first six months of the three-year contracted period.

Österreichische Kerndaten · 2 Quellenansichten Details
Frist beendet

Extending the feasibility study for a European transport market study and on updating the transport market studies of the Rail Freight Corridors (RFCs) - RFC_ETMS_FS_2023_24

IT-Dienstleistungen
RailNetEurope Frist Publiziert 07. Apr. 2023

The methodologies for conducting of the previous transport market studies (TMSs) of individual Rail Freight Corridors (RFCs) varied considerably, thus making the contents of these studies often incomparable. Moreover, due to the different point in time at which individual RFCs went into operation, the timeline and periodicity of updating the TMSs varied among individual RFCs. In 2022, these aspects have been addressed by means of a dedicated project involving the representatives of all RFCs, resulting in a feasibility study for conducting a European TMS (focusing mainly on freight transport) and a draft of dedicated RNE guidelines for updating RFCs’ TMSs. Consequently, RNE was also requested by the European Commission (via the call for technical assistance to RNE in 2023-24) to extend the first feasibility study for conducting a European TMS of 2022 in order to put an equal focus also on the passenger transport in 2023 and to set up a detailed implementation plan in 2024. These deliverables are to be provided in a broader perspective of conducting a complex European TMS in 2025 (and beyond). On top of the above, in late 2022, the RFC Network requested RNE to support the RFCs in 202

TED – EU-Amtsblatt · 2 Quellenansichten Details
Im Workspace

RailNetEurope beobachten und neue Signale priorisieren.

Passung für Ihr ProfilErneuerungsradarWettbewerberAlerts & Wochenbriefing
14 Tage kostenlos testen