Lieferung Reservepol für bestehenden Siemens 1200 MVA Spar-Regel-Transformator 380/220/30kV (1-phasige Trafopol 400 MVA)
- Elektrotechnik
- Frist
- Veröffentlicht
Lieferung von 1 Stk. Reservepol für bestehende 1200 MVA Spar-Regel-Trafobank
Leistungsgegenstand
In the course of the requirements of the Clean Energy Package (Article 16 (8) (EU) 2019/943), which provides for a minimum level of transmission capacity for cross-border trade, APG specified a tool that will be used for the future (NTC) Capacity calculation, taking this minimum value into account. In this method, based on a D-2 network model, the network element that limits cross-border electricity trading between the profile AT <-> CZ/HU/SI is determined for a certain trading hour. The tool then calculates the NTCs in such a way, that a predefined minimum capacity for cross-border trade is made possible on this network element. In addition, the tool enables the calculation of minimum capacities for all network elements in the D-2 flow-based capacity calculation.
Im Arbeitsbereich
Lieferung von 1 Stk. Reservepol für bestehende 1200 MVA Spar-Regel-Trafobank
Lieferung von 1200 MVA Spar-Regel-Transformatoren 380/220/30kV (1-phasige Trafopole 400 MVA)
Erneuerung und Erweiterung dezentraler Phasor Measurement Units (PMU) und die dezentrale Konfiguration für eine künftige Einbindung in das bestehende WAMS. Die Software des WAMS und die tatsächliche Einbindung in das System sind nicht Teil der Ausschreibung.