Zum Inhalt springen
Alle Ausschreibungen
Frist beendetAktenzeichen APG20-56

Capacity calculation software for compliance with 70% CEP rule

Auftraggeber
Austrian Power Grid AGÖsterreich
Veröffentlicht
zuletzt geprüft 24.09.2026, 13:10
Angebotsfrist
Nicht veröffentlichtlaut amtlicher Bekanntmachung

Leistungsgegenstand

Worum geht es?

In the course of the requirements of the Clean Energy Package (Article 16 (8) (EU) 2019/943), which provides for a minimum level of transmission capacity for cross-border trade, APG specified a tool that will be used for the future (NTC) Capacity calculation, taking this minimum value into account. In this method, based on a D-2 network model, the network element that limits cross-border electricity trading between the profile AT <-> CZ/HU/SI is determined for a certain trading hour. The tool then calculates the NTCs in such a way, that a predefined minimum capacity for cross-border trade is made possible on this network element. In addition, the tool enables the calculation of minimum capacities for all network elements in the D-2 flow-based capacity calculation.

  • IT-Dienstleistungen72212100

Zeit & Verfahren

Veröffentlichung
21. Apr. 2020
Abgabe
—
Verfahrensart
Dienstleistung
Erfüllungsort
Wien

Im Arbeitsbereich

Passt diese Ausschreibung zu Ihrem Team – und was ist jetzt zu tun?

  • Passung zu Ihren Geschäftsbereichen
  • Erneuerungsprognosen
  • Agenten mit Freigabe
  • Wissensdatenbank
Demo anfragen

Gleicher Auftraggeber. Weitere offene Verfahren.

Offenin 24 Tagen€ 1 Mio.

Rahmenvereinbarung Phasor Measurement Units (PMU)

  • Labor- und Präzisionsgeräte
  • IT-Dienstleistungen
  • Wien
Frist
Veröffentlicht

Erneuerung und Erweiterung dezentraler Phasor Measurement Units (PMU) und die dezentrale Konfiguration für eine künftige Einbindung in das bestehende WAMS. Die Software des WAMS und die tatsächliche Einbindung in das System sind nicht Teil der Ausschreibung.